About Course
SketchUp
Download here: Sketchup
“Use AF-MINCH coupon at the checkout to save 5% on your SketchUp Pro/Studio subscription/s.”
Master the art of converting your construction site into a 3D model. Learn the best practices for visualizing and planning your projects in a dynamic and intuitive way.
Why is SketchUp an important must have tool.
- Complete 3D sketching and modelling enabling easy interpretive planning, design/constructability concepts, methodologies and strategies
- Creating easy to read plans designs and methodologies to add to the standard 2D sketching and long winded text narratives that no one likes to read
- Will set you apart from the pack in terms of assisting the tenders team for their methodologies, your site Crew teams and clients for critical high risk work packages. Enabling clear visualisation of proposed constructibility methods
- Import AutoCAD Geo reference base map and model over your projects exact site conditions with existing landscape, roads, Buildings, Structures etc showing how they interact with your project
Activity:
Import AutoCAD geo reference map into model
Create a 3D model of Wilton Sewer Pumping Station
Course Content
Sketchup – Why is SketchUp an important must have tool
-
Introduction
03:24 -
Sketchup
01:05:59
Student Ratings & Reviews
No Review Yet